UEAiX
Utility Energy
Analytics Experience
Cloud-native Analytics for Utilities - Where Efficiency, Reliability, and Sustainability Meet in One Live Digital Twin.
Utility Load Distribution
Peak Demand Load -- kW
0 kW LIMIT: 600 kW
Unified Plant Layout • Digital Twin
Global Status: Optimal
CHILLER_PLANT
Chiller
LOAD_PV
-- TR
AIR_STATION
Air
PRESS_PV
-- BAR
TOWER_FARM
Tower
APPR_PV
-- °C
NITROGEN_PSA
Nitrogen
PURITY_PV
-- %
Master Plant Distribution
Global Site Flow

--

NM³/H
CHILLER_PLANT
Chiller
LOAD_PV
-- TR
TOWER_FARM
Tower
APPR_PV
-- °C
Master Plant Distribution
Global Site Flow
-- NM³/H
AIR_STATION
Air
PRESS_PV
-- BAR
NITROGEN_PSA
Nitrogen
PURITY_PV
-- %
Global Power

kW
Energy Use

kWh
Daily Cost

USD
Carbon (CO₂)

Tons
Plant Load Performance [kW]
Actual
Baseline
AI-Powered Operational Insights
CHILLER EFFICIENCY DEVIATION

System detected a 12% drop in kW/TR on CH-02. Check condenser approach temperature.

PEAK DEMAND OPTIMIZATION

Shift N2-01 regeneration cycle to 22:00 to avoid Tier 2 peak pricing window.

LEAK DETECTION ALERT

Compressor AC-04 running unloaded for 32% of last hour. Potential line leak in Area 4.

Active Alerts Corridor
1 CRITICAL 2 WARNING
Critical
CHILLER_TRIP_CH03
17:08:12 | MOTOR OVERTEMP
Warning
DEV_POINT_EXCURSION
16:55:04 | DRYER_01_REGEN
Warning
N2_PURITY_LOW
16:12:30 | N2-02 (98.2%)
Info
DATA_FABRIC_SYNC
17:00:00 | BATCH_COMPLETE